Nestlé Nigeria PLC · Project write-up

Nestlé, project by project.

Nine pieces of work across the main factory, Site 2 and the distribution centre: what went wrong or needed doing, what I did, and how it ended. This is the redacted version.

Redacted version

Why parts of this page are blacked out

This is a live factory. The full write-up covers network layouts, device counts, cutover sequencing and how recovery and access are handled: details that map out how a working site is built and protected. I don't publish those. The shape of each project and how it ended are all here. The specifics are shared on request, one reader at a time.

The full version is shared on request.

Request the full write-up
  1. 21 Feb 2025Join as IT Systems Support
  2. Jan – Feb 2026Cisco to Aruba migration
  3. Apr 2026Main link failure
  4. Apr – Jul 2026Acting IT Coordinator
  5. 18 Sep 2026CWAR all-hands
  6. NowSoft handover, still carrying a lot

01 · Jan – Feb 2026

Cisco to Aruba, the whole factory

Replaced the factory's whole wireless and switching estate, vendor to vendor, without stopping production.

  • 300+ access points
  • ~50 switches and routers
  • Almost 20 major buildings
Context
The factory ran on Cisco: access points, switches, routers. All of it was being replaced with Aruba.
Problem
Cisco and Aruba can't be connected the way like-for-like replacements can, so there was no clean swap. Some equipment was incompatible with the new setup in both directions, which meant . And the factory couldn't stop.
What I did
I planned and configured it: redundancy first, then stages. I brought up the new network beside the old one and moved one section at a time, starting with and ending with . Every move had ready in case it went wrong, and the whole thing ran as a side operation so production never had to care.
Outcome
About five minutes of downtime per access point, ten when a switch or an AP failed or something unexpected happened. Done across January and February 2026.
Withheld
Cutover sequencePer-area planRollback approachDevice inventory

03 · Mid-April – early July 2026

Acting IT Coordinator

Ran IT for the whole site for three months with four interns, in a seat built for three people.

  • 3 months
  • 4 interns
  • 20+ tickets a day
Context
The coordinator was promoted, the first hire for the job backed out, and the replacement started late. The seat stayed empty for about three months.
The ask
A managerial role listing five years of experience. I had just over one. I applied, I didn't get it, and I think that was reasonable. I had already shown I could do the work, so I did it.
Scope
The main factory (all departments, staff, infrastructure and network), Site 2 (two new plants, one starting up and one under construction), and the distribution centre, which had been mine since about my third month.
The interns
Four of them. I kept them busy and learning and kept it professional, managing the friction that comes with a team of peers. Over time they ran the day-to-day ticket queue while I coordinated and moved onto the heavier work.
Outcome
The site ran through the gap. In July the new coordinator started and we did a soft handover. I'm still carrying a lot while she learns.

04 · 18 September 2026

The CWAR regional all-hands

Coordinated a quarterly regional IT all-hands for nearly fifty people, and recovered it when the date turned out to be wrong.

  • Nearly 50 people
  • Quarterly, across the region
Context
A quarterly event that brings together IT from the region's sites and countries.
What I did
I coordinated it almost single-handedly. I split the work into streams for the interns: art, media, imagery and content in one, slides in another. Their ideas made it into the programme; most of the ideation and nearly all of the execution was mine.
Problem
A week before the event, we found the team on the slides had the wrong date: 22 October, not 18 September. The five weeks of runway they thought they had didn't exist.
The fix
The ideation was already done, so what remained was execution. I took it on myself and doubled the pace. Execution holds up under pressure. Ideation doesn't.
Outcome
It ran on 18 September. Leaders across the region recognised the programme and the effort behind it.

05 · Since about month three

The distribution centre

A remote site of 20 to 30 people that can't stop, run mostly by phone.

  • 20–30 people
  • Handheld scanners
  • Label printers
Problem
Distance, users who aren't technical (so small problems get bigger), and printers. A label printer going down stops the building, and the pressure to fix it immediately is intense.
What I did
I ran it single-handedly alongside my main-site duties: remote calls, troubleshooting, teaching people the software, and raising SAP issues with the SAP team, since SAP support is mostly outsourced. For hardware faults I called or sent an intern.
Outcome
No real downtime. I'm available fast, and I sort it fast.
Withheld
Device inventoryVendor and escalation contactsSAP specifics

06 · Site 2 build-out

Site 2: the server room

Hands-on for the server room of the new site: servers, switches, fibre and endpoints.

  • Servers and VMs
  • Switching
  • Fibre
What I did
I was hands-on for the server room: the servers, the switches, the fibre runs and the endpoints. That covered and configuring each switch to our standard: .
Boundaries
I wasn't hands-on for the access point and cabling deployment, but I was close to it.
Withheld
Server and switch countsFibre and cabling layoutSwitch standards and VLAN design

07 · For more than a year

Onboarding and IT induction

Every new hire and every intern goes through me before they get access.

  • Every full-time hire
  • Every intern
Problem
Every new hire is a security risk until they understand the rules, and the people who join are not all equally careful.
What I did
I'm the entry point for everyone who joins. I run the IT induction: secure IT, cyber-security and phishing awareness, information handling and access management. I screen them before their account is activated by , then onboard them with their details and roles. I do this myself because of the stakes; the interns take over afterwards with the tools, mail and first passwords.
Outcome
The screening catches people who weren't paying attention or misunderstood something, before they have access.
Withheld
Induction materialScreening methodAccess policy specifics

08 · Ongoing

Recovery, monitoring and compliance

The checks that make sure recovery works before anyone needs it.

  • Recovery drills
  • Backups
  • Monitoring
Recovery drills
Periodically I , simulate and run restores, so we know recovery works before we need it.
Backups
Monitoring
across the network and the access layer.
Server room
are kept and maintained.
Dashboards
I don't build the Power BI dashboards for compliance and asset governance. I act on what they show.
Withheld
Backup schemeMonitoring stackCompliance records

09 · Ongoing

Everyday support

The second-line work that keeps the rest of the site moving.

  • Second-level support
  • Provisioning
The daily work
Second-level support for what the service desk can't resolve, tracked in the ticketing system. Provisioning, hardware assignment and asset tracking, workstation stability across admin and production, , and network readiness and endpoint installs for newly commissioned areas.
The plotter
The engineering plotter had been down for months. I got the OEM involved and had the parts replaced.
Withheld
Tooling and asset details